Skip to main content
CERN
Accelerating science
Sign in
Directory
Main navigation
Toggle navigation
BE
About CEM
Mandate
Organigramm
Projects
CEM wiki (CERN only)
Sections
Electronics Design & Low level software (EDL)
Electronics Production & Radiation Tolerant (EPR)
Infrastructure (IN)
Measurement, Test & Analysis (MTA)
Mechatronics, Robotics & Operation (MRO)
News
Get involved
News
Topic
- Any -
At CERN
Electronics Design & Low level software (EDL)
Electronics Production & Radiation Tolerant (EPR)
Infrastructure (IN)
Measurement, Test & Analysis (MTA)
Mechatronics, Robotics & Operation (MRO)
Tag
Date from
Date to
Apply
First RF Cavity inner surface fully inspected by a robotic system
15 September, 2022
First RF Cavity inner surface fully inspect...
15 September, 2022
Drone 3D Visual Inspection in the North Area TCC2
31 May, 2022
Drone 3D Visual Inspection in the North Are...
31 May, 2022
The CHARM facility's operations have been successfully restarted
11 May, 2022
The CHARM facility's operations have been s...
11 May, 2022
Pagination
Previous page
Previous
Next page
Next